Wrinkles, Bridging, Uplift and Ballasting during Liner Installation
Organizer: Ian D. Peggs (I-CORP INTERNATIONAL, Inc., USA)

There have recently been a number of geomembrane liner installation projects involving ponds and dams where concern has been expressed about the occurrence of bridging, wrinkles, wind uplift, and associated ballasting. For instance most liner installation projects state that there shall be no bridging in corners or at the toes of slopes. Where there are wide swings in temperature, bridging can appear and disappear. Is it important that bridging be removed if it occurs at the lower installation temperatures when pond filling will occur at higher temperatures and service temperatures will be higher when no bridging is observed? Is bridging worse than an area of repair extrusion welds? Can bridging be resolved by ballasting the liner until it touches the ground? For all materials? How do we repair wrinkle-type bridging along a seam?

At the high end of installation temperatures wrinkles can occur. At what size/geometry do they become unacceptable? Height more than twice the width? When they can flop over? How do we repair wrinkles? Or how do we prevent them forming in the first place?

Ballasting can clearly be used to prevent/minimize movement of the geomembrane both laterally and vertically. Typically, when ponds are to be empty as a part of their operating cycle ballast unit weights and their distribution are defined by the project engineer. However, this is typically to prevent wind uplift rather than to manage expansion (wrinkles) and contraction (bridging). But who is responsible for ballast placement during liner installation? Certainly the installer is responsible for ballasting to prevent the liner from blowing away altogether, but is the installer, the engineer, or are both of them responsible for ballasting for the management of wrinkles and bridging?

  1. 1.Managing Wrinkles, Bridging, and Ballasting during Geomembrane Installation (Ian D. Peggs)
  2. 2.Review of MQC and MQA by Material and Manufacturing Factors on Wrinkle Formation and Propagation of Geomembranes Before/After Installation (Han-Yong Jeon)
  3. 3.Analysis of wrinkles and bridging of geomembranes leading to practical guidance (J.P. Giroud)
  4. 4.Third Party Testing of Geomembranes for a Safer Environment (Phillip Bennett)
  5. 5.Managing Wrinkles, Bridging and Ballasting during Geomembrane Installation (Ho Kum Hou)